ZTSYJ2017-CGS021 Tongliao power section power transformers and other open procurement negotiations announced
Tongliao Power Supply Section of China Railway Shenyang Bureau Group Co., Ltd. is conducting an open procurement for power transformers and related projects. The project is funded through a change in the original budget, and the funds have now been secured. As part of this initiative, the Shenyang Railway Bureau has decided to procure necessary materials and equipment through an open negotiation process, inviting qualified domestic suppliers to submit their bids.
1. **Project Overview**
The main objective of this project is to ensure the safe and stable operation of power supply equipment. This includes the procurement of high-quality power transformers and other essential components that meet the technical standards required by the railway system.
2. **Procurement Basis**
The procurement process is conducted based on the following regulations:
1. "Measures for Material Management of Shenyang Railway Bureau" (Shen Iron Materials [2017] No. 14)
2. "Administrative Measures for Material Purchase and Supply of Shenyang Railway Bureau" (Shen Iron Materials [2017] No. 15)
3. "Implementation Rules for Material Purchase Management of Shenyang Railway Bureau" (Shen Iron Materials [2017] No. 21)
4. Notice from the Planning and Statistics Division of Shenyang Railway Bureau Group Co., Ltd. regarding the implementation of the 2017 renovation plan recovery work.
3. **Sources of Funds**
The funding for this project has been adjusted and is now fully allocated. All financial arrangements are in place to support the procurement activities.
4. **Purchase Content**
Detailed information regarding the type, quantity, and delivery location of the materials and equipment to be procured can be found in Annex 1 of the public negotiation announcement.
5. **Qualification Requirements for Bidders**
5.1 The bidders must meet the following criteria:
- Be a manufacturer or distributor registered within the People's Republic of China with the legal capacity to bear civil liability.
- Have a registered capital of at least RMB 1 million.
- Maintain a good business reputation and a sound financial accounting system.
- Possess the necessary equipment and professional technical capabilities to fulfill the contract.
- Have a record of legally paying taxes and social insurance contributions.
- Not have any major violations in business activities over the past three years.
5.2 This open negotiation does not accept bids from consortia.
5.3 If the registered capital is not clearly stated, the bidder must provide the official registration documents from the local business administration.
6. **Acquisition of Negotiation Documents**
6.1 The period for purchasing negotiation documents runs from December 13th to December 15th, 2017, between 8:00 AM and 4:00 PM (Beijing Time).
6.2 The cost of the negotiation documents is RMB 500, and they are not sold in packages. Bidders may purchase documents for multiple packages, but they must accurately fill in the package numbers in the registration form.
6.3 A deposit of RMB 400 is required (for package A02), and the bidder must include the package number and item number in the remarks section when making the telegraphic transfer.
6.4 The deposit must be transferred via bank wire or electronic transfer from the bidder’s official account (personal transfers are not accepted) and must be received by the Shenyang Material Supply Segment before December 12th, 2017 (two business days prior to the bid opening).
7. **Submission of Quotation Documents**
The deadline for submitting quotation documents is from 8:00 AM to 8:30 AM on December 20th, 2017. The final submission time is 8:30 AM on the same day. Any late submissions will not be accepted.
P03 Series Push Wire Connectors
Smaller size, space saving
Fast connection
111
Push-in Cable Connector,Dual Poles Quick Wire Connectors,fast connection cable connectors,cable managing connectors
Jiangmen Krealux Electrical Appliances Co.,Ltd. , https://www.krealux-online.com