Tender No. Bidding Code: CBL_20161116_188941611
Bulletin category: Domestic tender

Tenderee: Datang Dongying Power Generation Co., Ltd. Source of funds: Others (4 bids) Datang Dongying 2X1000MW New Construction Mobile Grab Cleaner Equipment (Secondary) Tender Notice Tender Number: CWEME-DTDY-201606WZ-001
Industry: Electric Power Industry Labelling Category: Domestic Tendering Information Source of Funding: Self-raised Tenderer: Datang Dongying Power Generation Co., Ltd.

Region: Dongying City, Shandong Province, tender content:
Pursuant to the "Law of the People's Republic of China on Tendering and Bidding" and relevant laws and regulations, the principle of openness, fairness, impartiality, and good faith is followed, and commissioned by Datang Shandong Power Generation Co., Ltd., on the second level of the project (see the scope of tender and qualification requirements for details). Domestic open tendering will be held. Qualified units are welcome to attend the tender.
1 Project Overview:
Datang Dongying 2×1000MW new construction project is located in the Dongying Port Economic Development Zone in the northern part of Dongying City, within the breakwater of Gangcheng City, and borders on the Bohai Sea to the east and the north. It is about 110 kilometers away from Dongying City. It is the “Planning Blue Economic Zone Development Plan of Shandong Province” and "The development plan of the Yellow River Delta efficient eco-economic zone" key power projects. It plans to build a 4×1000MW ultra-supercritical coal-fired turbine-generator unit and construct a 2×1000MW ultra-supercritical coal-fired unit in the first phase of the project. The host intends to use secondary intermediate reheating and six-cylinder six-bar steam condensing steam turbines to simultaneously establish flue gas desulfurization, denitrification and dust removal devices. The unit cooling adopts the seawater direct current circulation method, the industrial water adopts the seawater desalination process, the desulfurization adopts the limestone-gypsum wet desulfurization process, the flue gas system does not have flue gas bypass, the desulfurization efficiency is not less than 98.7%, and the low-nitrogen combustion technology and selection are adopted for the denitration. SCR technology, using liquid ammonia as denitrification reducing agent, denitrification efficiency is not lower than 85%; dust removal adopts low-temperature electrostatic precipitator, integrated dust removal efficiency is not less than 99.93%, and pollutant emission index reaches gas turbine emission standard.
2 Construction site: Dongying Port Economic Development Zone, Dongying City, Shandong Province
3 Bidding scope and qualification requirements:

Tender number

name

Qualification, performance

CWEME-DTDY-201606WZ-001

Mobile grab cleaning equipment (secondary)

Registered capital: 30 million yuan and above.
Certification certificate: The bidding enterprise has passed the ISO9000 quality management system certification, and its certificate is within the validity period.
Production license: Yes.
Delivery performance: The sales, design, and manufacture of 2 sets of 1000MW and above capacity unit equipment performance.
Performance: In the past 5 years, the bidder has a set of equipment with capacity of 1000MW or above and has more than 2 years of good operating experience. No major equipment quality problems or effective improvement measures have been found during installation and commissioning.

4 Bidder qualification requirements:
4.1 Must have independent legal personality of the People's Republic of China and have a valid and valid business license.
4.2 The person in charge of the unit is the same person or a different unit that has a controlling or managing relationship and may not participate in the bid for the same tender item or for the same tender item that is not divided into bid segments.
4.3 Imported Equipment (Materials) The bidder shall provide the manufacturer or manufacturer of the bidding equipment the only authorized agent for this project.
4.4 Has a perfect ISO9001:2008 quality management system certification or equivalent quality assurance system certification.
4.5 Qualification requirements: The qualifications and capabilities of the design, manufacture or complete set of equipment for this tendering are detailed in the scope of tender and qualification requirements.
4.6 Performance requirements: Having good operating performance of the same type of products in the country, see the scope of tender and qualification requirements.
4.7 With good bank credit and business reputation, it is not being ordered to suspend business, property is taken over, frozen, or bankrupted.
4.8 The bidder has not breached the contract or been executed in any contract in the past 5 years, or any contract was terminated due to the bidder's reason.
4.9 The bidder has not been involved in economic lawsuits due to violations of laws or regulations in the past three years.
4.10 There was no fraudulent bid or serious breach of contract in the last three years.
4.11 There have been no cases of borrowing others or lending qualifications or performance to others.
4.12 The Commonwealth does not accept bids in this tender.
5 How to Obtain Bidding Documents: (.)
Release date: November 16, 2016 to November 30, 2016. (It takes 5 to 7 days to process the CA certificate electronic key, including material preparation, mail processing, and CA certificate electronic key return time. Please properly consider the arrangement processing time. Overdue system will not be able to download the bidding documents and the bidding fee will not be refunded. .)
Bidding document purchase price: 824 yuan (The bid for the second tender, previously purchased bids, upload the last wire transfer can be)

※ Deposit payment: account number and operation are based on the pre-additional table of bidder's instructions for bidding documents!
6 Submitting bid documents
6.1 deadline for submission of tender documents (bid deadline, the same below): December 10, 2016 at 10:00 (Tentative, specific to the opening notice shall prevail).

6.3 Delivery method: The bidding documents shall be sealed as required and delivered to the designated place. If the goods are delivered late or not delivered to the designated place or are not sealed as required, the tenderee will not accept it.

Contact: Zhang Jie

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

Small Rice Mill Machine

mini rice mill

HuangShi Stee Metal Material Technology Exploitation Co.,Ltd , https://www.wosenstechnology.com