Fiber Optic Distribution Box,Fiber Optic Breakout Box,Fibre Optic Breakout Box,Fibre Break Out Box Cixi Dani Plastic Products Co.,Ltd , https://www.danifiberoptic.com
Bidding code: CBL_20090330_3622857
Bid opening time:
Industry: Machinery and electronics, other types of tenders: Domestic tendering sources: Other regions: Jiangsu Details: Contact: Sun Bo mobile phone is entrusted to open tenders for the required lamps, the relevant matters are announced as follows :
1. Name, quantity and specifications of the tendered goods:
Downlights, bracket lights, grille lights, etc., the number is about 2000 sets
2. The bidding documents will be issued after the pre-qualification of the potential bidders.
2.1 For bidders applying to participate in this tender, please provide the following pre-qualification documents (original and two copies):
2.1.1 Having the status of an independent legal person, the bidding content shall be provided with a business license (copy) within the business scope of its business license; if the agent bids, please also provide the business license (copy) of the bidding equipment manufacturer and agent, and provide The manufacturer bids for a special power of attorney.
2.1.2 Provide the power of attorney of the legal representative of the bidder.
2.1.3 Relevant qualification documents for equipment manufacturing.
2.1.4 Provide the manufacturer to pass the ISO quality management system certification.
2.1.5 The financial and operating conditions of the enterprise are good. The registered capital of the manufacturer is not less than 10 million yuan. If the agent bids, the registered capital of the agent is not less than 1 million yuan. Have the ability to perform contracts, have no bad business practices in the past three years, and provide the latest credit certificate.
2.1.6 Provide the same list of users (including project name, equipment name, main technical parameters, quantity, contract signing date, user unit name, address, contact person, telephone number) of the manufacturer in the past three years; and provide manufacturing at the same time. The company has 2 contracts with the same bidding equipment in the past three years.
2.1.7 Provide a description of the after-sales service organization and personnel configuration in Nanjing.
2.2 The time for submission of prequalification documents is: March 30, 2009, until April 3, 2009, 8:30-11:30 am, 14:00-17:00 pm (Beijing time). Holiday break.
2.3 Submit the prequalification document Location: Jiangsu Province
2.4 The original of the qualification review documents shall be used for verification. After verification, the documents will be returned on the spot and the copies will not be returned.
2.5 The units submitting the prequalification documents will also conduct an inspection of the production plant and actual performance. The contents and results of the inspections are also part of the prequalification content.
2.6 Through the pre-qualification unit, after receiving the notice from our company, we will go to our company to purchase the bidding documents.
3. Deadline for bid submission and time for bid opening: according to the requirements of the bidding documents.
Contact: Sun Bo Mobile: 13811136601
Phone: 010-88180474
Fax mailbox:
Tender No.: NJHW-090413